In November 2025, GGRS Energie completed a flagship solar installation at the Kelly Group’s National Training Centre in Brimsdown. This turnkey project involved the full end-to-end delivery of a 115.2kW system, designed to drastically lower operational overheads and secure the site’s energy future. Current modelling suggests the current system is expected to supply nearly a fifth of the site’s total power requirements.
As a primary national hub, the Brimsdown centre required a significant amount of power to maintain daily operations. The objective was to implement a high-capacity solar solution that could integrate seamlessly with existing infrastructure while generating a meaningful proportion of on-site energy.
GGRS Energie managed the entire lifecycle of the project—from bespoke system design and procurement to final commissioning.
Solar Array: 115.2 kW total capacity.
Hardware: D-Meg 455W high efficiency panels
Inverter: 1 x Solis-100K-5G-PRO (High-performance industrial series).
Energy Impact: Projected to provide 18% of the site’s total energy needs.
Modelling indicates that the system may deliver significant long-term cost reductions, depending on future energy prices and consumption patterns.
Estimated Annual Savings: £18,159.95
Estimated Payback Period: Approximately 5 years.
System Cost: £97,078.52
Projected Lifetime Utility Savings: Over £1,006,760.
Projected Net Lifetime Savings: £909,682.72