The ongoing partnership between GGRS Energie and Birktek Solar demonstrates GGRS’s experience in supporting large-scale, multi-site solar deployment programmes across residential and commercial properties. Managing projects across diverse property types whilst maintaining consistent installation processes and quality standards throughout England, Scotland, and Wales.
Managing a nationwide rollout requires more than just technical expertise; it demands rigorous logistical coordination. The objective was to deliver high-volume installations across diverse building types, ranging from domestic homes to commercial facilities, while maintaining a steady pipeline for future capacity.
GGRS Energie provided a versatile workforce capable of handling a hybrid portfolio. By focusing on core operational strengths and collaborative project management, the team has successfully streamlined the transition from site survey to commissioning and final handover to our clients.
Completed Sites: 40 projects finished to May 2026
Current Deployment: 1,800+ high-efficiency panels installed.
Current Capacity: 756 kWh of operational solar power.
Future Pipeline: 5,932 additional panels scheduled for upcoming phases, adding a further 2,620 kWh of capacity.
The installed systems are estimated to contribute meaningful long-term carbon reductions through the generation of renewable electricity at these 40 sites.
Estimated CO2 Saved: 1,669.5 tonnes over project lifetime*.
Environmental Equivalency
Comparable to the estimated carbon absorption of approximately 12,000 trees over time*
*Environmental estimates are based on projected system generation and standard carbon conversion methodologies. Actual results may vary depending on usage, generation performance and operational lifespan.